PROJECTS

TEST STAND

  • Design and build
  • Control with PLC and HMI
  • One touch button operation
  • Online print from HMI
  • Easy maintain and trouble shooting
  • Save cost on labor and improve productivity.

TRAIN SIMULATION

  • Design for train defect handling simulation system
  • PLC+HMI system and able to re-signaling in the future.
  • Trainer eject fault in master screen and trainee clear fault in trainee’s screen
  • Easy maintain and service.

AUTO VEHICLE WASH PLANT

  • Install safety mechanical or electrical stopper for roller
  • PLC Controlled Automatic System(Koyo D330,Mishubishi FX3U)
  • Additional Programmed for local control mode
  • Onboard Control Panel
  • Automatic / Manual Mode
  • Touch Screen Interface for data logger and statues
  • Easy to Operate
  • Easy to Understand and Maintain

SIEMENS INVERTER REPAIRING

  • F011 over current faulty
  • Replaced PCB board for over current
  • Setting to correctly driver setting
  • Testing and commissioning